• ramesh@crpcontrol.com
  • +91-9323901534

Integrated System Test

Integrated system test involves overall testing of systems present in the facility and their dependency on each other.

Following equipments are tested during IST:

  • HT Panels/ RMU
  • Transformers
  • Diesel Generators
  • Main LT Panel
  • UPS/ Static Switches
  • PAC/ PAHU
  • Fire Alarm System
  • Fire Hydrant System
  • Vesda
  • Gas Suppression System
  • Lifts
  • WLD